B got almost done with the ceiling last night and noticed a few rotten floorboards. So now:
- The sewer pipe needs to be replaced (where it runs through the wall in my living room, natch)
- The entire floor of the bathroom must be replaced
- The toilet must be capped off, moved, the floor replaced, replumbed and put back
- All the ceiling tiles just put up will have to be ripped down
We will live like gypsies in a caravan, I think. A tent in the backyard?
I need to start drinking. What time is it again???
And nevah, nevah open my mouth without getting the full story first - or at least pausing first!!!
Yummy, yummy crow. Tastes like chicken!
1 comment:
Cheer up! The blender thingy is headed you-wards.
-J.
Post a Comment